Who Is Your Maturity Rating For?
An assessment run to improve and one run to be quotable are different exercises. Organisations rarely say which they are commissioning, and the result shows it.
Professional knowledge and strategic perspectives across strategy, projects, operations, engineering, transformation and business performance.
26 articles found
An assessment run to improve and one run to be quotable are different exercises. Organisations rarely say which they are commissioning, and the result shows it.
A schedule looks calculated. Its duration is actually asserted, one dependency at a time, by people nobody asked what enforces the ordering.
Once an item passes the likelihood threshold it is reclassified out of the risk process entirely, which leaves the enterprise funding the improbable and absorbing the certain.
Quality sits in operations and its cost sits nowhere. Until finance can produce the number, prevention will always lose the argument to correction.
Managers rarely lie to executives. They wait. The upward channel carries a price to the sender, leadership sets that price, and almost nobody audits it.
Cost-coded control systems see only work that carries a code. Deciding carries none, so governance delay is charged to delivery and priced nowhere in the enterprise.
How leaders can improve function, outcomes and whole-of-life value without allowing short-term savings to weaken the enterprise system or its resilience.
Every function in your organisation has an owner. The interfaces between them usually have none — and that is where delivery quietly fails.
How finely work is broken down fixes both what the control system costs to run and how late a problem can surface — yet almost no enterprise sets either number on purpose.
The register that authorises and carries risk treatment has no field for what the treatment costs, so controls are bought on gross benefit and never on net.
Why portfolio and transformation leaders should map interfaces, dependencies and coupling before adding more projects, people or governance.
The project's clock starts at team formation. The enterprise's clock started with a decision months earlier, and nobody owns the interval between them.
Key-person concentration is a valuation question, not a continuity policy. It has a price today, while everyone is still here, and buyers find it in days.
How standing offers and schedule-of-rates arrangements can reduce sourcing effort while controlling pricing, dependence, capacity and performance.
PMO standards create value when they remove repeatable administrative effort and sharpen decisions without forcing diverse initiatives through identical machinery.
Why executives must define quality before delivery begins, connecting customer value, requirements, assurance and disciplined investment choices.
A green quality report proves you built what you described. It cannot tell you the description was worth building — and no assurance procedure ever will.
When productivity falls, local pressure can worsen the system. Diagnose feedback loops, congestion, rework, fatigue, capability and management conditions first.
How leaders can restore performance under pressure without cutting the critical skills, maintenance, trust and operating capacity needed for recovery.
How leaders can use OEE and loss analysis to identify real capacity constraints without turning a useful manufacturing measure into a misleading target.
Why utilisation and local productivity can increase queues, inventory and lead time, and how leaders should manage end-to-end flow around system constraints.
Why isolated Lean tools rarely create durable performance and how leaders can connect flow, problem solving, standard work and management behaviour.
Make-or-buy is usually argued on unit cost. The margin most firms think they gain by making is conditional on scale they may not have.
Procurement negotiates price. Strategy maps where margin is captured along the chain — and tests whether the analysis behind the decision would survive scrutiny.
How inspection, testing, hold points, witness points, defect records and calibrated evidence can make supplier performance objectively governable.
How procurement planning should include spares, maintenance, support, repair, calibration and operating capability rather than stop at asset handover.